info@ilkagrup.com

Blog

7 things to check in a build-and-share contract
9/15/2026
7 things to check in a build-and-share contract

Before handing over your land for a build-and-share project, the clauses your contract must contain: share ratio, schedule, specification, penalties and title transfer.

Read More
Is your building ready for an earthquake? When strengthening is needed
9/8/2026
Is your building ready for an earthquake? When strengthening is needed

Buildings built before 2000, without a design, or with a ground floor converted into a shop may be at risk. Learn the condition of your building with a seismic performance analysis.

Read More
From building permit to occupancy: the 8 stages of a construction project
9/1/2026
From building permit to occupancy: the 8 stages of a construction project

Which steps does a residential project go through, from land purchase to the occupancy permit? Process, durations and what to watch at each stage.

Read More
6 things to know before starting a renovation
8/25/2026
6 things to know before starting a renovation

How to plan the budget, which works need a permit, what the contract should contain. A checklist to avoid regrets in home and workplace renovation.

Read More
Pre-season maintenance checklist for summer houses in Seferihisar
8/18/2026
Pre-season maintenance checklist for summer houses in Seferihisar

Damp, plumbing and roof problems build up in summer houses left empty over winter. 10 points to check before the season opens.

Read More
Building a house in Seferihisar: zoning, choosing land and the 5 factors that set the cost
8/11/2026
Building a house in Seferihisar: zoning, choosing land and the 5 factors that set the cost

For those thinking of buying land and building in Seferihisar: how to read the zoning status, what each area offers, and what determines the cost per square metre.

Read More